Insulations

Insulations

Sobre este proyecto

In Division Pipe Insulation (lagging) facilities cold / industrial heat, conducted with various insulation materials and finishes, according to the needs of each installation, customizing every detail of the installation. When insulation is made polyurethanes, polyurethane is used PIR Certified AFITI European fire reaction Standard BL-s1, d0.

Materials:

Polyurethane

Injected polyurethane

Polyurethane shell

Polyurethane + maylar

Elastomeric insulation (Armaflex)

Different types of fibers and mineral wool (especially suitable for heat insulation of pipes)

Finishes:

Aluminium variety of colors

Stainless steel

Galvanized Sheet

Lacquered sheet

1.Tuberías coated with aluminum and subsequent placement of polyurethane injection.

2.Time pumping glycol water to -7.

3.Tuberías and deposits insulated by polyurethane injected aluminum finish.

4.Zona of compressors, piping-storage facility connection.

See isolates catalog (soon will be available)

Details

Date:  30 September, 2015
Skills:  Aislamientos
Tags:  aislamientos, aislamientos valencia
Client:  Aisproyec S.L.